Title Goes Here

Gulf Beach Highway Intersection Improvement-Patton Drive and Sunset Ave

A feasibility study for the construction of intersection improvements along the corridor of Gulf Beach Highway was prepared by Atkins Consulting.  The study determined that the installation of traffic signals at the intersections of Gulf Beach Highway and Sunset, and Gulf Beach Highway and Patton Drive were necessary.
  • The consultant submitted 100% construction plans to FDOT, and received FDOT permit approval

  • After two separate bid advertisements, the County received construction bids that were substantially higher than budgeted. The County, after many consultations with FDOT, has decided to postpone the permanent improvements until after the FDOT CR292A Bridge Replacement Project.

  • The County and FDOT have been collaborating on how to fund the permanent improvements through a potential cost-sharing agreement.

  • 3
  • 2
  • 1

Last Updated: 08/09/2017

Project Manager:
Nick Chauvin

Email:
Nick_Chauvin@myescambia.com
Office Phone:
850-595-3443
Architect/Engineer:
Atkins
District #:
District 2
CRA District:
Safe Neighborhood District:
Funded:
Yes
Funding Sources:
L.O.S.T.
Sponsoring Division:
Public Works - Traffic
Project Status:
Design
Funded via Local Option Sales Tax:
No

Related solicitations

Related continuing contracts

Tags