Current Projects | Completed Projects

Quintette Road Bridge Scour Bowls CR184

The Quintette Road Bridge is in a "scour critical" condition. Scour is a condition in which the river bed washes away from the bridge piers and piles supporting the bridge.  Dive inspections revealed a loss of embedment around piers and piles in both the main and secondary channels - the loss is significant enough to warrant repair.

Last Updated: 6/22/2017

  • Phase I: Repair of piles/bents over Quintette Lake
    • Construction Complete
  • Phase II: Repair of piles/bents at the main Channel of Escambia River
    • Construction Complete
  • Quintette_1
  • Quintette%202_1
Project Manager:
Office Phone:
(850) 595-3450
Architect/Engineer:
Volkert, Inc; Mott MacDonald; Metric Engineering (CEI)
Contractor:
DKE Marine Services
District:
District 5
Funded:
Yes
Funding Sources:
L.O.S.T.
Sponsoring Division:
Engineering - Construction Management