Following the April 2014 storm event, the area of Blue Springs Avenue and Crescent Lake suffered significant storm damage to public infrastructure and private properties. Escambia County responded to the damages with the following repair projects:

  • Crescent Lake Dam redesigned and reconstructed. National Resources Conservation Services (NRCS) provided reimbursement assistance ~ $527,788, of the total $ 818,135 project costs.
  • Blue Springs Avenue repairs, total $1,085,008 for FEMA reimbursement request.
  • FEMA East Shore & West Shore Drive outfall pipe replacements to Crescent Lake total $362,500.

Given the extent of damage in this area, Escambia County completed the Blue Springs at Clearwater Long Term Drainage Analysis to address drainage deficiencies in the area East of Crescent Lake to determine the best approach for funding drainage improvements to provide for future sustainability for the area, and mitigate such drainage impacts from future occurrence. Six potential stormwater improvements were evaluated to reduce the potential for flooding in the area. Two of the options were referred to FDOT for consideration to make improvements to the Empire Pit.  Four alternatives were evaluated to provide stormwater attenuation and treatment for the upstream basin, contributing to Blue Springs Avenue, in the area of Sun Valley Drive, Glass Drive, Clearwater Avenue. The recommended alternative is to maximize the pond stormwater volume, depending upon successful property acquisition.  The recommended solution can be found in the figure below.

Milestones

Milestone Date Notes
Warranty Completion/Warranty Dates 2/25/2021 to 2/25/2023
Construction Final Completion 2/25/2021
Construction 75% Complete 12/20/2021 Substantial Completion: 1/25/21
Final Expected: 2/25/21
Construction 50% Complete 11/4/2020  
Construction 25% Complete 10/10/2020
Construction Notice to Proceed 8/3/2020
Construction Award 5/29/2020
Bid Opening 5/1/2020
Construction Advertisement Date 4/24/2020
Permit Acquisition 3/10/2020
Property Acquisition 8/19/2019
100% Design Plans 11/25/2019
60% Design Plans 9/11/2019
30% Design Plans 7/7/2019
Design Notice to Proceed 4/16/2018     
Design Award 4/13/2018
A/E Fee Negotiation 2/8/2018
A/E Presentations/Selection 1/5/2018
A/E Shortlisting 1/3/2018
A/E Selection Process Start 10/13/2017

Last Updated:

 
  • Photo of Pond at Glass Drive
  • Photo of Pond on Blue Springs Drive
  • Photo of Sun Valley Drive Damage caused by Hurricane Sally
  • Photo of Drainage Pipe Installation on Sun Valley Drive
  • Ten Mile Road Aerial Photo
Project Manager:
Office Phone:
850-595-0797
Cell Phone:
850-490-0167
Architect/Engineer:
McKim & Creed
Contractor:
Chavers Construction
District:
District 1
Funded:
Yes
Funding Sources:
L.O.S.T.
Sponsoring Division:
Engineering - Construction Management
Date Completed:
2/25/2021
Escambia Countuy Logo

The mission of Escambia County government is to provide efficient, responsive services that enhance our quality of life, meet common needs and promote a safe and healthy community.

Under Florida law, IP addresses and both the content of emails and email addresses are public records. If you do not want your IP address and the content of your email or your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in person.

All content © 2023 Escambia County, FL and its representatives. All rights reserved.