Skip Navigation
 
 
Current Projects | Completed Projects

2023-2024 Resurfacing - Districts 1-4

This project consists of the resurfacing and/or reconstructing in portion or whole of various roadways within Escambia County. The project will include work associated with the reconstruction of roadways such as maintenance of traffic, stormwater pollution prevention, sod stabilization shoulder work, pavement striping including reflective pavement markers (RPM), etc. The contractor is to maintain traffic flow at all times with minimal delays. Roadways are to have two-way traffic opened during all non-working hours. Lane closures will be granted by County staff during working hours. The contractor shall resurface Bauer Road and Patton drive during non-school hours. 

Milestones

Milestone Date Notes
Warranty Completion/Warranty Dates 1/17/2025  to 1/16/2027
Construction Final Completion 1/16/2025  
Construction Notice to Proceed 6/24/2024  10% Complete  
Construction Award 6/3/2024
Bid Opening 5/17/2024

Last Updated:

                  ROADS IN BOLD TYPE                  HAVE BEEN COMPLETED 
DISTRICT ROADWAY To From
    
1 ITHACA DR CHOCTAW AVE NORTH END
1 MAYA COURT SOUTHEAST END CHOCTAW AVE
1 CHOCTAW AVE EAST PAVEMENT CHANGE OMAHA DR
1 CHOCTAW AVE EAST PAVEMENT CHANGE ARAPAHO DR
1 OMAHA DR NORTH END SOUTH END
1 CHINOOK AVE CONCHO DR OMAHA DR
1 CONCHO DR SHOSHONE DR CHOCTAW AVE
1 PAMLICO CIRCLE SHOSHONE DR WEST END
    
1 PEPPERTREE COURT PEPPERTREE CT PEPPERTREE LN
1 PEPPERTREETERRACE NORTH END PEPPER TREE LN
1 PEPPERTREE COURT S'LY CUL-DE-SAC N'LY CUL-DE-SAC
1 PEPPERTREE LN US98 NW SD LIMITS
    
1 BAUER RD SORRENTO RD SR292 PINFISH RD
1 TINOSA CIRCLE SOUTH GULF MANOR SOUTH GULF MANOR
1 TINOSA LN TINOSA CIR TINOSA CIR
1 SOUTH GULF MANOR NORTH CUL-DE-SAC TINOSA CIRCLE
    
2 PATTON DR GULF BEACH HWY NAVY BLVD
2 PERDIDO STREET OLD CORRY FIELD RD NEW WARRINGTON RD
2 MERITO STREET OLD CORRY FIELD RD WEST END
2 LAKE JOANNE DR 72ND AVE 61ST AVE
2 LAKE JOANNE DR CUL-DE-SAC LAKE JOANNE DR
    
3 SYCAMORE DR BRENT LN AMBER
3 CAMELIA DR (EAST) CONCORDIA BLVD CONCORDIA BLVD
3 MOCCASIN TRAIL NORTH END LEPLEY RD
3 MEMORY LN AIRPORT BLVD PALAFOX ST
3 OLD FAIRFIELD DR W/ FERNWOOD AVE RR CROSSING
3 YOAKUM CT W ST CONCORDIA BLVD
3 LENOX PARKWAY CONCORDIA BLVD W ST
3 BOULDER AVE CHICAGO AVE MEMPHIS AVE
3 SLOAN CIRCLE WEST END PVMNT HWY29
    
3 N H ST W LEONARD ST W YONGE ST

3 N G ST W LEONARD ST W YONGE ST
3 N F ST W LEONARD ST W YONGE ST
3 W FISHER ST N H ST N E ST
3 W CROSS ST N H ST N E ST
3 W HATTON ST N H ST N E ST
3 W SCOTT ST N H ST N E ST
    
4 ST ALBAN RD ST CEDD AVE AIRPORT BLVD
4 ST BARNABAS ST ST ALBAN RD ST AMATUS RD
4 ST AMATUS RD ST EUSEBIA ST AIRPORT BLVD
4 SYCAMORE DR ST JOHN'S BRENT LN
Project Manager:
Office Phone:
850-595-0797
Cell Phone:
850-490-0167
Contractor:
Roads, Inc.
District:
District 1 , District 2 , District 3 , District 4
Funded:
Yes
Funding Sources:
L.O.S.T.
Sponsoring Division:
Engineering - Construction Management
Date Completed:
1/17/2025
Escambia Countuy Logo

The mission of Escambia County government is to provide efficient, responsive services that enhance our quality of life, meet common needs and promote a safe and healthy community.

Under Florida law, IP addresses and both the content of emails and email addresses are public records. If you do not want your IP address and the content of your email or your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in person.

All content © 2023 Escambia County, FL and its representatives. All rights reserved.