Exception:
Metal and tile roofs must still have a dry-in and flashing inspection called and an inspection successfully completed before the work can proceed.
Hurricane Mitigation:
Effective immediately, pictures are required to be submitted with the affidavits. The affidavits will still be required to be posted on the job sites at the time of final inspection.
Stagger Pattern of Shingles:
Due to the various stagger patterns for shingles, even among the same manufacturer's own product lines, it is necessary to have a wrapper on the job site at the time of final inspection on any permits obtained after August 11, 2008.