West Roberts Road Drainage and Roadway Improvements

The West Roberts Road Drainage and Roadway Improvements project is a segment approximately 1.75 miles along West Roberts Road in District 5. The construction area begins at Highway 29 and continues west to the 90° turn at Sutton Place. This project will provide improved drainage and reduce road overtopping during rain events, as well as other safety improvements to the roadway. Improvements include roadway widening increasing both travel lanes to12-foot with 5-foot shoulders from Highway 29 to Pine Forest Road. The roadway from Pine Forest to the 90° turn will be resurfaced and striped.  Additionally, the drainage system will be realigned to accommodate the wider roadway and upgraded to current standards within the County right-of-way.

Milestones

Milestone Date Notes
Design Award 3/21/2024 Gulf Civil Engineering, LLC.
RLI Advertised 2/8/2024
A/E Shortlisting 3/7/2024
A/E Fee Negotiation 3/20/2024 First negotiation.
A/E Presentations/Selection 3/13/2024
A/E Selection Process Start 2/2/2024

Last Updated:

Project Manager:
Architect/Engineer:
To Be Determined
Contractor:
To Be Determined
District:
District 5
Funded:
Design Only
Funding Sources:
L.O.S.T.

Files

Escambia Countuy Logo

The mission of Escambia County government is to provide efficient, responsive services that enhance our quality of life, meet common needs and promote a safe and healthy community.

Under Florida law, IP addresses and both the content of emails and email addresses are public records. If you do not want your IP address and the content of your email or your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in person.

All content © 2023 Escambia County, FL and its representatives. All rights reserved.