The Oak Valley Drive Bridge Replacement project is located in the Woodridge Subdivision in District 1.
Construction included repairing the cross drain in order to re-establish the design-flow capacity and reduce the potential for future overtopping and flooding during storm events. The project required sediment and debris removal from the cross-drain system, regrading and stabilization of the upstream and downstream areas within the right-of-way, removal and replacement of the existing roadway, cross-drain piping, and installation of guardrail and curb inlets.
Milestone | Date | Notes |
---|---|---|
BCC Project Approval | 8/24/2024 | - 8/24/2025 |
Construction Final Completion | 8/24/2024 | |
Construction Notice to Proceed | 12/4/2023 | |
Construction Award | 9/21/2023 | C W ROBERTS |
Bid Opening | 9/6/2023 | |
Construction Advertisement Date | 6/30/2023 | |
100% Design Plans | 4/19/2023 | |
60% Design Plans | 10/27/2022 | |
Design Notice to Proceed | 1/19/2021 |
Last Updated:
The mission of Escambia County government is to provide efficient, responsive services that enhance our quality of life, meet common needs and promote a safe and healthy community.
Under Florida law, IP addresses and both the content of emails and email addresses are public records. If you do not want your IP address and the content of your email or your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in person.