Skip Navigation
 
 
Current Projects | Completed Projects

Meadowbrook Bridge #484089 Repair

Infrastructure damages from Hurricane Sally consist of erosion, sedimentation, and scour. Excessive rainfall caused the bridge to over top resulting in retaining wall failure and sedimentation on the upstream side of the bridge. Erosion scour, and weir failure occurred on the downstream side of the bridge. Sedimentation also occurred throughout the channel.   

Repairs to the upstream/downstream channel areas and the retaining wall/weir system impacted during the storm will be made when construction funding is approved.

Milestones

Milestone Date Notes
Construction Notice to Proceed ANTICIPATED: JUNE 2024 (Six-week lead time on sheet pile)
Construction Award 2/22/2024 Gulf Marine (PO approved)
Design Notice to Proceed 4/23/2020
100% Design Plans 4/13/2023 100% plans review underway. Permits pending.

Last Updated:

FEMA Project #165174
Project Manager:
Architect/Engineer:
Sigma Consulting Group
Contractor:
Gulf Marine
District:
District 5
Funded:
TBD
Funding Sources:
FEMA
Sponsoring Division:
Engineering - Construction Management
Escambia Countuy Logo

The mission of Escambia County government is to provide efficient, responsive services that enhance our quality of life, meet common needs and promote a safe and healthy community.

Under Florida law, IP addresses and both the content of emails and email addresses are public records. If you do not want your IP address and the content of your email or your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in person.

All content © 2023 Escambia County, FL and its representatives. All rights reserved.