Skip Navigation
 
 

FDOT: U.S. 90 Bridge Replacement over Simpson River

Published Oct 21, 2022

FDOT letterhead graphic


Media Contact: Kohen Johns Brannon

(888) 638-0250, ext. 1661
[email protected]

Construction crews have temporarily shifted eastbound traffic to the westbound bridge over Simpson River. The shift is expected to be in place through March 2023. During this time, there will be two westbound lanes and one eastbound travel lane using the westbound bridge. Due to the traffic shift, there will not be dedicated bike lanes on the bridge. Drivers are urged to use extra caution as they will be temporarily sharing the bridge with cyclists. Drivers are also reminded that the speed limit is 35 mph through the work zone.

All activities are weather-dependent and may be delayed or rescheduled in the event of inclement weather. Drivers are reminded to use caution, especially at night, when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway.

For more information, visit the Florida Department of Transportation District Three on the web at www.nwflroads.com, follow us on Twitter @myfdot_nwfl and Instagram @myfdot_nwfl, or like us on Facebook at MyFDOTNWFL.

Visit Us on Social Media

Escambia Countuy Logo

The mission of Escambia County government is to provide efficient, responsive services that enhance our quality of life, meet common needs and promote a safe and healthy community.

Under Florida law, IP addresses and both the content of emails and email addresses are public records. If you do not want your IP address and the content of your email or your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in person.

All content © 2023 Escambia County, FL and its representatives. All rights reserved.