Skip Navigation
 
 

FDOT Jan. 26, 2018 Escambia County Traffic Alert

Published Jan 26, 2018

Contact: Tanya Branton, (850) 330-1599, [email protected]

Chipley, FL - Drivers will encounter traffic disruptions on the following state roads in Escambia and Santa Rosa counties as crews perform construction and maintenance activities. 

Escambia County:

  • U.S. 29 Resurfacing between U.S. 90 and Muscogee Road - Alternating north and southbound lane restrictions from Muscogee Road to West 9 ½ Mile Road, from 8 p.m. to 6 a.m. Sunday, Jan. 28 through Saturday, Feb. 3 as crews perform paving operations.
  •  State Road (S.R.) 742 (Creighton Road) Construction Improvement Project from east of Davis Highway to Scenic Highway – Intermittent and alternating lane closures between Davis Highway and Scenic Highway from 8:30 p.m. to 5:30 a.m. Sunday, Jan. 28 through Saturday, Feb. 3 continue as crews perform milling, paving, sidewalk and curb replacement. 
  • Interstate 10 (I-10) / U.S. 29 Interchange Improvements Phase I -  Traffic impacts planned on I-10 and U.S. 29 near the interchange (Exits 10A and 10B) from 8 p.m. to 6 a.m. Sunday, Jan. 28 through Thursday, Feb. 1:
    • Alternating lane closures on I-10 east and westbound and U.S. 29 north and southbound.
    • The U.S. 29 on-ramps to I-10 eastbound will be intermittently closed. Traffic will be detoured on U.S. 29 to access I-10 eastbound.
    • The exit ramp from I-10 westbound to U.S. 29 south (Exit 10A) will be intermittently closed. Traffic will be detoured to U.S. 29 north (Exit 10B).
    • Alternating lane closures on the I-10 westbound exit ramp to U.S. 29 north (Exit 10B).
  •  I-10 Widening from Davis Highway to the Escambia Bay Bridge – Intermittent and alternating lane closures on I-10, between Davis Highway (Exit 13) and Scenic Highway (Exit 17), and on Scenic Highway, between Whisper Way and Northpointe Parkway, from 7 p.m. to 6:30 a.m. Sunday, Jan. 28 through Thursday, Feb. 1 as crews perform construction activities. The speed limit on I-10 will be reduced to 60 mph during nighttime lane closures.
  • S.R. 292 (S. Pace Boulevard) Drainage Operations Temporary Road Closure at Barrancas Avenue- The north and south travel lanes on S. Pace Boulevard just north of Barrancas Avenue will be closed to traffic from 7 p.m. to 5 a.m. Monday, Jan. 29 through Friday, Feb. 2 as the city of Pensacola performs drainage work.  Traffic will utilize Government Street and Barrancas Avenue as a detour route. Variable message boards and signs are on site to assist the public.
  • Nine Mile Road (S.R. 10/U.S. 90A) Widening from Beulah Road to Pine Forest Road - Foxtail Loop will be closed from 5 a.m. to 8 p.m. Monday, Jan. 29 as crews install new storm water drainage. Drivers entering and exiting Nature Trail Subdivision must use Salt Grass Drive to access Nine Mile Road.
  • U.S. 98 (S.R. 30) Pensacola Bay Bridge Replacement- Alternating lane closures on U.S. 98 east and westbound, between 14th Avenue in Pensacola and Bay Bridge Drive in Gulf Breeze, from 8 p.m. to 5 a.m. Sunday, Jan. 28 through Thursday, Feb. 1 as crews perform construction activities.
  •  U.S. 29 Widening from I-10 to Nine Mile Road – Drivers traveling U.S. 29 and Nine Mile Road will encounter traffic pattern changes from 8 p.m. to 6 p.m. Sunday, Jan 28 through Saturday, Feb. 3 as follows: 
    •  Nine Mile Road at the U.S. 29 overpass-Lane restrictions will be in effect Sunday through Friday. Eastbound traffic will continue to be shifted onto the westbound inside travel lane as crews prepare the area for construction of the support column for the new center bridge deck.
    • U.S. 29 between I-10 and 9 1/2 Mile Road: Lane restrictions will be in effect Monday through Saturday. Drivers will encounter alternating lane closures as crews perform drainage work and place temporary pavement in preparation for upcoming traffic shifts.  

All activities are weather dependent and may be delayed or re-scheduled in the event of inclement weather. Drivers are reminded to use caution, especially at night, when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway.

For more information visit the Florida Department of Transportation District Three on the web at www.nwflroads.com, follow us on Twitter @myfdot_nwfl, or like us on Facebook at www.facebook.com/MyFDOTNWFL

www.fdot.gov 

Visit Us on Social Media

Escambia Countuy Logo

The mission of Escambia County government is to provide efficient, responsive services that enhance our quality of life, meet common needs and promote a safe and healthy community.

Under Florida law, IP addresses and both the content of emails and email addresses are public records. If you do not want your IP address and the content of your email or your email address released in response to a public records request, do not send electronic mail to this entity. Instead, contact this office by phone or in person.

All content © 2023 Escambia County, FL and its representatives. All rights reserved.