Title Goes Here

Olive Road East

Olive Road East is a District 4 Roadway Reconstruction and Drainage project located east of Davis Highway. 2.3 miles of roadway reconstruction will be completed from Davis Highway to Johnson Avenue. Construction will include a two-lane curb and gutter with a center continuous left-turn lane; bike paths; and sidewalks; re-alignment of Johnson Avenue with Harbour Square Drive and a complete overhaul of the drainage system, including two stormwater ponds. Project to be constructed in two phases.

 Phase 1:   
Construction from Gregg Road to Yancey Avenue will continue through December 2017

  • 60% Complete
  • South lane paving ongoing through March 2017, pending weather. Expect Traffic Delays During Paving Operations
  • During the paving of the south lane, traffic control measures will require Right Turn Only for several properties located on the south side of Olive Road

 Phase 2:  

  • 100% Plans in Review
  • Anticipated Construction 2017

  • East Olive Map
  • Olive Road East 4
  • Olive Road East 3
  • Olive Road East 1

Last Updated: 03/07/2017

Project Manager:
Sharon Johnson

Email:
Sharon_Johnson@myescambia.com
Office Phone:
850-595-3416
Architect/Engineer:
DRMP
Contractor:
Roads Inc
District #:
District 4
CRA District:
Funded:
Partial
Funding Sources:
L.O.S.T.
Sponsoring Division:
Public Works - Engineering
Project Status:
Construction
Funded via Local Option Sales Tax:
Yes