Title Goes Here

Grande Lagoon Subdivision Drainage

In response to the storm damage & flooding of April 2014, a study was completed to evaluate the Grande Lagoon Subdivision drainage area. The County contracted Hatch Mott MacDonald to perform the study and provide alternatives to improve the drainage in the Grande Lagoon Subdivision. Hatch Mott MacDonald was subsequently contracted to conduct the FEMA (Phase 1) drainage design and storm mitigation improvements. Phase 2 will address the improvements to the Grande Lagoon drainage system.

  • Phase 1 - Complete
    • Funded by Federal Emergency Management Agency (FEMA)
  • Phase 2 - Conceptual Stage
    • Permitting Anticipated to be complete: October 2017, pending ACOE permit
    • Funded by LOST
    •  100% Plans Completed: September 2017
    • Bidding: October 2017

  • Site%203%20Grande%20Lagoon
  • site%202%20grand%20lagoon
  • Site%20#3%20@%20Spillway%202015-12-21%20(2)
  • Site%20#2%20Pipe%20Installation%202016-01-15%20(7)
  • grande_1
  • grande%20lagoon%20Drv
  • frande1_1
  • Grande%20Lagoon%20Drainage%20Study

Last Updated: 10/12/2017

Project Manager:
Derek Fox

Email:
Derek_Fox@myescambia.com
Office Phone:
(850) 595-2413
Architect/Engineer:
Mott MacDonald
Contractor:
Site 7 Utility LLC (Phase I)
District #:
District 2
CRA District:
Safe Neighborhood District:
Funded:
Yes
Funding Sources:
L.O.S.T., Federal Grant
Sponsoring Division:
Public Works - Engineering
Project Status:
Pre-Bid
Funded via Local Option Sales Tax:
Yes

Plans

Related solicitations

Related continuing contracts

Tags

  • 2014 Flood