Estates at Emerald Shores

Damage to Pond #536 occurred during the April 2014 storm event. This project includes two areas: Repairs to County Pond #536 and a Secondary Wetland Outfall System. The project area is located in Estates at Emerald Shores subdivision on Gunwale Road. Repairs to the pond have been completed. The secondary project goal is to alleviate flooding within the subdivision by providing a secondary outfall for the wetland area in the center of the subdivision. This secondary outfall will provide emergency overflow capability during extreme storm events.

  • Construction is complete for Pond 536 as funded by FEMA to repair April 2014 storm damage.
  • Construction of secondary outfall system from the wetland area in the center of the subdivision is pending successful drainage easement acquisition.     
  • Down-gradient property owner is considering the easement acquisition.

  • IMG_2014
  • Estates%20at%20Emerald%20Shores-MAP

Last Updated: 09/19/2017

Project Manager:
Chris Curb

Email:
Chris_Curb@myescambia.com
Office Phone:
850-595-3419
Architect/Engineer:
Mott MacDonald
Contractor:
TBD
District #:
District 2
CRA District:
Safe Neighborhood District:
Funded:
Yes
Funding Sources:
Sponsoring Division:
Public Works - Engineering
Project Status:
Pre-Construction
Funded via Local Option Sales Tax:
No

Plans

Related solicitations

Related continuing contracts

Tags